Risky building assessment under Law No. 6306 is as much a procedural process as it is a technical one. Common mistakes often begin at the data collection stage.
01 Process steps
The assessment proceeds through data collection, capacity calculation, and risk evaluation; the output of each step forms the basis for the next.
02 Common mistakes
Representing concrete strength with insufficient cores, incomplete reinforcement detection, and neglecting soil data are the most common technical errors.




