02
Performance AnalysisMay 9, 2026
Record selection, scaling, and target spectrum compatibility for time-history analysis — a practical checklist.
03
Performance AnalysisMay 2, 2026
Across isolation period, soil class, and cost; when to use isolation, and when to use damping.
04
RegulationApril 24, 2026
The steps of risky building assessment, the application process, and the most common technical errors in reporting.
05
StrengtheningApril 16, 2026
Jacket thickness, anchor layout, and epoxy injection details; what to watch for in execution.
06
System DesignApril 8, 2026
The hysteretic behavior of velocity-dependent and displacement-dependent devices; which one under which condition.
07
Performance AnalysisApril 1, 2026
Continuous use and limited damage targets for structures that must remain functional after an earthquake.
08
System DesignMarch 24, 2026
Stiffness distribution and ductility in systems where steel frames and reinforced concrete shear walls work together.
09
FieldMarch 17, 2026
Rapid screening of the building stock; priority score, data collection form, and routing to the next step.
No articles in this category yet.