In critical structures such as hospitals, the target goes beyond life safety: it is continuous use. The performance target is the starting point for every design decision.
01 CU and LD targets
Continuous Use (CU) and Limited Damage (LD) targets are defined for structures that must remain functional after an earthquake.
02 Impact on design
A high performance target requires lower drift limits, damping, and sometimes isolation.




